Thursday, October 7, 2010

Wall Street Journal’s: Top 10 Reasons to Own a Home:

1. You can get a good deal – you will never catch or time the bottom and it really doesn’t matter in the long haul anyway (remember you are buying a home not a house)

2. Mortgages are cheap – lowest on record that you will not see again in your lifetime (What is the mortgage rate this week????  Around 4.2%!!!!!!!!!!!!!!)

3. You will save on taxes – this often is the key analysis of the total cost in in the rent vs owning, and these tax breaks can be huge

4. It will be yours – you can change the kitchen, the paint, etc. You cannot do that when you rent!

5. You’ll get a better home – in many parts of the country, it’s hard to find a a good rental. Buying often gets you the best. (and in areas with the best schools)

6. It offers Some Inflation Protection – it’s not perfect, but over the long-term housing has tended to beat inflation by a couple % points a year

7. It’s Risk Capital – over the long-run your home’s equity is linked to the growth of the economy

8. It’s Forced Savings – most people don’t save their money, but part of the mortgage payment goes to principal repayment, not a cost – equity

9. There Is A Lot To Choose From – great choices and great prices as there are more homes on the market than ever

10. Sooner Or Later the Market Will Clear – Supply and demand will meet again for equilibrium

You should send this post to all. If an expert non-biased reporting from the Wall Street Journal doesn't convince someone to purchase a home this year, nothing will. They will be sitting on the sidelines saying "I should have ........."

Wednesday, October 6, 2010

Housing Scenario

Depending upon the source, the number of new homes needed each year varies slightly and the following is the most recent estimate.

400,000 homes are demolished each year and must be replaced
1,400,000 new households are formed each year. Although there is evidence that this number has decreased since the recession started simply because of the job market and family members moving back together. As an example, college graduates are moving back with their parents since they can’t find a job.

In my June 18th post, I used 1,500,000 new homes are needed to satisfy the demand and replenish the housing stock.

So why do we have new housing starts hovering between 500,000 and 600,000 this year and LESS than 500,000 in 2009.

From 2002 – 2009, it is estimated that there were 3,000,000 new housing starts in EXCESS of the households formed.

A scenario that may happen:
Because of population increase and household formed, the demand is being met by the difference between the 1,500,000 new housing starts needed and the actual/estimated 600,000 new housing starts.

My simple conclusion is that the inventory of excess number of units built will exhausted between the end of 2011 and mid-2012. My prediction:

Housing shortage in 2012.
Interest rates much higher back to the 6-7% range
Material shortages i.e. concrete, sheetrock, lumber, etc.
Labor shortages
Results: inflation and escalating home prices

We have less than a year to position our business to a new reality. Don't be watching from the sidelines.
Review the following graph and come to your own conclusions. After all, I don’t expect anything from our national leaders anytime soon – after all they are on VACATION!!!


Monday, October 4, 2010

Due Diligence Report - Neighboring Property

1. Existing and Proposed Uses

Start with a recent aerial photo to understand the existing uses of land adjacent to the property in question (PIQ). During the site visit, investigate all adjacent parcels for existing development patterns. Understand the relationship of the existing uses and development pattern and illustrate how the existing developments may or may not impact the PIQ’s development approach. Take photos and inventory each for future reference. Find out if there is an association or a property management company involved with any of the existing projects.

Research the land use map, master plan, and zoning map for the surrounding property as well as for the property under consideration for purchase. It is important to understand the development potential of the adjacent property and how it may impact the development plans for the PIQ. It is conceivable that the adjacent property should also be purchased for subsequent phases of the project. The adjacent property may have attributes that would significantly increase the market appeal of the PIQ. Each parcel would be a puzzle piece in the development pattern and how the property fits together for a comprehensive development pattern is advantageous for the community and developer.

2. Positive and Negative Surrounding Property Analysis

Prepare a detailed list of the positive and negative impacts surrounding properties may have on the development pattern of the PIQ. Consider technical, marketing, and political aspects of each property and describe how to overcome the negative and how to best utilize the positive aspects of the development. As an example:

(a) Technical – the adjacent property may have an endangered species on the property requiring a buffer which may extend into the PIQ.

(b) Marketing: the proposed development may be consistent with the adjacent existing project and both project designs must be have road and pedestrian connectivity.

(c) Political: the PIQ is adjacent to a 4,000 unit active adult community – and the intended use is first time homebuyer product.

3. Neighborhood Reaction to Development Plans

• Citizens are voicing their opinions at public hearings
• Seek neighborhood and community input on project plans and goals
• Create guidebooks on development costs and regulatory processing costs
• Outline citizen involvement in the process and define their role
• Prepare educational material on the public approval process
• Educate newly appointed board members on the process
• Develop an effective and mediation or arbitration system
• Increase public awareness

4. Political Assessment

It is important to know the political climate of a community. Is it a “no growth community” or a community open to growth and new growth trends? With each local approval/permit requirement, the more influence the politicians will have over the property and its use.

Become familiar with:

• The local politicians that would support your project
• The staff that processes projects and their influences
• Learn the regulatory permitting process
• The surrounding neighborhood and if they will oppose to the project
• The community “hot buttons” for inclusion in the project design
• An experienced land use/zoning attorney
• Master plan and growth management plans
• Subdivision approval process and the time required “to be in the ground”

Friday, October 1, 2010

Next Due Diligence Report Section

A. Neighboring Property


1. Existing and Proposed Uses

2. Positive and Negative Surrounding Property Analysis

3. Neighborhood Reaction to Development Plans

4. Political Assessment

We are about half way through the due diligence investigative report outline. Remember you can use this approach to assess the development potential of vacant property. I will probably complete the section on Neighboring Properties next week so that I can concentrate on revisiting housing issues as the mid-term elections fast approach. Remember the power of 1-vote!

I happen to believe that as "Housing goes so goes the Economy".
As I revisit statistics, policies, and trends, I want to ask you these questions --
Are you better off today than this time last year?
Will you be better off NEXT year at this same time? If so, what is your inspiration for change?

Thursday, September 30, 2010

Due Diligence Report- Regulatory Section

9. Entitlement, Approval and Permitting Processes


The most important section of the regulatory analysis is the understanding of the plan review and approval process required by local government. Each local municipality has their own unique approach to assessing development applications. Most developers will indicate that a project schedule and the success of the project are pre-determined during the regulatory review process. Time is money and delay during the review process is not uncommon which only adds to the cost of developing land.

The zoning entitlement process is typically a different time line than the approval of project plans based on approved zoning. The rezoning process may take longer and may have a defined set of dates in which milestones must be achieved, i.e. community meetings, informal staff consultations, etc. This schedule can’t be modified since it is cast in stone by the politicians at the beginning of each calendar year. The rezoning time line will change by one month later if there is a problem with the rezoning application. Rezoning property is high risk with a high reward. Soft costs required to rezone property can be significant without assurances of obtaining approval. Take advantage of any informal meetings with the politicians, neighbors, and staff to understand their points of view.

This section should also include a contact list for the stakeholders involved in the rezoning process.

The review and approval of development plans may not be as stringent or legalized as the rezoning process. Obtain applications, fee schedules, and outline of the process which may indicate a specific submission date before the Planning Board will act on the application. Or the municipality delegates plan review approval to the staff and a time frame is provided in which the staff must act on the application. In either case, the time line may be expedited and include this option in the report. Provide the local regulatory time line, steps for approval and the contact list. The contact list may be different from those involved in rezoning cases.

Besides the written procedures, find out about Board traditions and any “unwritten” nuances exercised during the regulatory process. Summarize the findings because “this is the way we do things” will directly affect the project schedule and possibly add cost to the project. Remember the developer’s motto: “Be on time and within budget”. Following the regulatory plan review process exactly without alteration and with quality plans will minimize the time government takes to issue permits and approvals.

Wednesday, September 29, 2010

Due Diligence Report - Regulatory Section

8. Regional, State, and Federal Regulations


Compliance with local regulations does not necessarily ensure approval. Many local regulations are in conflict with regional, state and federal regulations. Other agency regulations may take precedence over local standards and/or regulations. During the due diligence period, the regulatory map and site characteristic research should indicate which agency may have jurisdiction in permitting the project. At each level of government, more fees and review time will be required to obtain approvals. In most cases, the permitting process for regional, state and federal agencies is not contingent upon local approvals. But the local approval is contingent upon obtaining ALL permits. It is the responsibility of the owner to obtain all permits that may be associated with the development of a site. As an example, the applicant may have to obtain a letter from another agency that simply states “no interest” in the project. Do not misjudge the importance of knowing the regulations and time line of the following agencies. At least know their overall regulatory charge and permitting time line.

Of the following agencies, an applicant should at least expect review and permitting of the project by the Soil Conservation District, State EPA, and the Corps of Engineers. Time is of the essence so learn how each agency will affect your project schedule.

REGIONAL AGENCIES
Soil Conservation District
Watershed District
Coastal Agency
Transportation District

STATE GOVERNMENT
Department of Transportation
Department of Environmental Protection

FEDERAL GOVERNMENT
Corps of Engineers
Environmental Protection Agency
Housing and Urban Development

Tuesday, September 28, 2010

Due Diligence Report - Regulatory Section

6. Stormwater Management Facility Requirements

Stormwater management facilities control the quantity of stormwater runoff leaving the property. To summarize, this requirement states that the quantity of runoff after development must not exceed the quantity of runoff leaving the site before development. You do not need to know the technical approach to accomplish this task but you need to understand the local municipal regulations on the design preferences, operation requirements, bonding, as-built requirements, ownership, and maintenance provisions. Stormwater management facilities use land suitable for buildings, etc. to control the quantity of stormwater runoff. Thus, the net buildable area will be reduced based on SWM requirements. Some provisions of the local SWM regulations may include: fencing, landscaping, maintenance access drives, location, and turnover procedures.



7. Best Management Practices

As stormwater management facilities control the quantity of stormwater runoff, best management practices, BMP, control the quality of the stormwater runoff prior to leaving the site. Again, there are numerous ways to achieve the water quality standards but the local regulations will outline municipal preferences, construction standards, operation, ownership, and maintenance requirements. BMP’s will require land for installation and the cost of installation may be high. More importantly, know their regulatory approach to construction inspection, as-builts, bonding, maintenance provisions, and the turnover process.